Why Competitors
are Rushing to meet our price:
In recent bids, the dominant competitor(s)
have reduced their bids to meet our price
for APC/MVPC. Is it because:

Their MVPC software is no better than our
GMAXC

We have reengineered the art of implementing
MVPC applications to reduce costs and project
time, while ensuring highly successful applications

We do not insist that the client should buy
a database as a pre-requisite

We are a new generation viable alternative
to a market dominated by a few large players
without serious competition
Let us know your
comments and thoughts.
New Products
GMAXC-S: Script add-on to the online
GMAXC controller allowing adapative and
non-linear control with conventional
Multivariable Predictive Control
DEA, Decipher for Events and Alarms:
An Intelligent Alarm Management System for
Collecting, Archiving, Displaying and
Interpreting Process Alarms and Events
Z-Way, Fuzzy Logic Controller:
A 6 input by 2 output fuzzy logic controller
capable of controlling hard to define/model
processes, and where normal PID controllers
fail to provide adequate control. Successfully
implemented on three Azeotropic Distillation
towers.
New Development(s)
at IntellOpt:
IntellOpt
has teamed up with Spectra
Dynamics Ltd. of India for APC projects in
India
IntellOpt has joined with CCSLA/ELEDISA,
Argentina (www.ccsla.com.ar)
in offering APC, MVPC, Advisory Systems and
Neural networks based solutions and software
products in Latin America.
Recent Projects
Awarded to Intelligent Optimization Group
Air Liquide China: GMAXC,
Multivariable Predictive Controller
Software sales
Linde, Stolberg (Germany): Air
Separation Unit APC/MVPC
Pluspetrol, Argentina: APC of Natural
gas plant (with ELEDISA)
Tuntex, Thailand: APC of PTA Unit,
Automation Study, APC Training
Sam Nam Petrochemicals, Korea: Alarm Management System
Oil India Limited (OIL):
APC/MVPC Training
Petrocel Temex: TA Oxidation
Reactor APC/MVPC
Sam Yang Kasei Co. Ltd, Korea:
Advanced Process Control of its PolyCarbonate
units (second project)
Air Liquide Industries:
World wide license of the GMAXC controller
for its industrial gas plants
ISA Conferences
(September 10, 2001, Houston, Texas)
'Minimizing Plant Testing for Multivariable
Predictive Control', paper presented by
Paul Davis (Cytec) and Hardey Beaver (IntellOpt)
Reengineering
the Implementation of Multivariable Predictive
Controllers (MVPC) for Lower Cost and Faster
Benefits Realization:
IntellOpt introduces an
interface between its GMAXC™ MVPC
controller and the HYSYS Dynamic Simulator.
Now, the entire MVPC controller can be configured,
modeled, tuned and tested in a virtual plant
environment thereby avoiding costly plant
disturbances and testing. The entire implementation
time can be reduced by an order of magnitude.
"Advanced Process Control in Record
Time", Control magazine, May, 1999.
MVPC Technology
Reduced to a Commodity Level
The GMAXC controller has been used successfully
to replace other brand name controllers
in a minimal amount of time without the
need of plant testing for re-modeling. Justification
for replacement - reduced life cycle costs
and ease of maintenance.
The trend towards commodity type MVPC technology
will eventually lead other established vendors
of multivariable controllers to offer significant
license discounts. However, we emphasize
total (software and services) lower costs
by supporting in-house implementation, third
party services and use of industry accepted
open systems interfaces.
Is the present
Multivariable Predictive Control Technology
sufficient for your frequent process and
operating mode changes? If not, update your
MVPC Controller and Technology to the Intelligent
Control Technology.
IntellOpt offers the world's first Intelligent
Controller, I-GMAXC. Now, you can combine
MVPC technology, nonlinear control, heuristic
control and sequence control in one G2™
Expert System based unified controller which
reformulates itself at every execution cycle
to provide a best combination of control
from start-up to shut-down including process
emergencies.
Existing brands of MVPCs can be easily migrated
to I-GMAXC without the need of plant re-testing.
Recent Media
Coverage of Intelligent Optimization Group
"Rule-Driven Optimization Boosts
Plant Performance", an article
describing the technology and flexibility
needed to deal with discontinuous operating
situations, Hydrocarbon Processing, Oct
2005.
"Advanced Process Control in
Record Time", an article describing
how Air Liquide automated its plant with
GMAXC/MVPC. The plant now runs around the
clock, but is manned only 40 hours per week.
"MVPC - Reengineering The Implementation",
paper presented at the CE Expo 99 conference,
Houston, Texas, June 10, 1999.
AIChE CAST Workshop - Intelligent
Controllers and Trends in MVPC, Houston,
Texas, December, 1998
Paper presented on ‘Intelligent
Controller, I-GMAXC – Delayed
Coker Process Control at the CE Expo 98,
Houston, Texas, June 3, 1998
APC Improves TA/PTA Plant Profits,
Hydrocarbon Processing, October,
1997